Category Archives: Case Studies

Case Study- Burnley College

Burnley college

Project:           Burnley College, Teaching Block & Sports Centre Extension Address:         Burnley College, Princess Way, Burnley, BB12 0AN Architects:       ABW Architects Ltd Contractor:     John Turner Roof size:       1200m2 Roof system:   Sika Sarnafil Single Ply Roof, G410-20EL, Sikatherm PIR GT Insulation, Sarnavap 500E SA vapour […]

Case Study- Clayton Triangle

Project:              Clayton Triangle Address:            Whally Road, Clayton-Le-Moors, Accrington, BB55HD Architects:         tadw Architects Contractor:       Watson Homes Roof size:            921m2 Roof system:     Alumasc Alkorplan Membrane Installation:       Mechanically Fixed About the project: The development […]

Case Study- ABInBev development

ABInBev development

Project:           ABInBev Address:         ABlnBev UK, Curedale Lane, Samlesbury, PR5 0XD Architects:     Patrick Parsons Contractor:    Morris & Spottiswood Roof size:        104m2 Roof system:   S-Vap 500 E, Sikatherm® PIR AL, Sikaplan® G-15, mechanically fastened Our role in the project at ABInBev UK: Here at Enviroply […]

Case Study- Former Stalybridge Police Station

Former Stalybridge Police Station

Project:              Former Stalybridge Police Station Address:            Former Police Station, Corporation Street, Stalybridge SK15 3LJ Architects:        Metek PLC Contractor:      Watson Homes Roof size:           496 m2 Roof system:     Alumasc Installation:        Alumasc Alkorplan Single […]

Case Study- Cotton Gardens

cotton gardens

Project:               Cotton Gardens Address:             Union Mill, Vernon Street, Bolton, BL1 2PT Architects:         Four Architects Contractor:       D&B Consult Roof size:            1170 m2 Roof system:     Alkorplan by Alumasc Reinforced Membrane, Alumasc Polyethylene Membrane Installation:    […]